FINAL EXAM Introduction of BIM enabled EPC assessments – Online course

To pass the course 80 % of the answers must be correct. In case you wish proof of passing the exam into your e-mail, add the needed information in the end of exam right before submitting. Certification of passing the exam is then automatically sent. Automated feedback is provided to all users on this page. Good luck!

1. 

EPC assessment method is never dependent of the building type, same calculation method apply to all buildings.

2. 

BIM cannot be used for EPC assessments in existing buildings.

3. 

Special requirements for BIM modeling are not needed, if inter-operable file-formats are used for the energy simulations.

4. 

Static calculations has the potential for more deatiled results than dynamic simulations.

5. 

All needed input data for EPC assessments automatically builds into BIM as project proceeds.

6. 

BIM enhance EPC assessment especially by

7. 

There are no national approaches allowed to EPC calculations. In EU all assessments are done in similar way for equal comparison.

8. 

Utilization of the geometry obtained from the BIM model is one of the biggest denominators for faster EPC assessment.

9. 

What benefits are there of fast EPC calculations? 

10. 

In assessing EPC for the standard use of the building the following input data is often fixed:

11. 

In cases IFC-file is directly imported from BIM to energy simulation software, what kind of EPC data can then usually be transferred?


Name Email