FINAL EXAM Introduction of BIM enabled EPC assessments – Online course

To pass the course 80 % of the answers must be correct. In case you wish proof of passing the exam into your e-mail, add the needed information in the end of exam right before submitting. Certification of passing the exam is then automatically sent. Automated feedback is provided to all users on this page. Good luck!

1. 

Where does the letters EPC come from?

2. 

Special requirements for BIM modeling are not needed, if inter-operable file-formats are used for the energy simulations.

3. 

Utilization of the geometry obtained from the BIM model is one of the biggest denominators for faster EPC assessment.

4. 

There are no national approaches allowed to EPC calculations. In EU all assessments are done in similar way for equal comparison.

5. 

In assessing EPC for the standard use of the building the following input data is often fixed:

6. 

What benefits are there of fast EPC calculations? 

7. 

All needed input data for EPC assessments automatically builds into BIM as project proceeds.

8. 

EPC assessment method is never dependent of the building type, same calculation method apply to all buildings.

9. 

BIM cannot be used for EPC assessments in existing buildings.

10. 

BIM enhance EPC assessment especially by

11. 

EPC calculators are based on equations reflecting the real world phenomena, such as thermodynamic equations.