To pass the course 80 % of the answers must be correct. In case you wish proof of passing the exam into your e-mail, add the needed information in the end of exam right before submitting. Certification of passing the exam is then automatically sent. Automated feedback is provided to all users on this page. Good luck!

1. 

In BIM-based projects all disciplines such as architects and HVAC-engineers work together on the same BIM model.

2. 

Where does the letters EPC come from?

3. 

Model Checkers can be utilized in EPC assessment for:

4. 

EPC assessment method is never dependent of the building type, same calculation method apply to all buildings.

5. 

What is the abbreviation of the directive behind EPC in the EU?

6. 

In assessing EPC for the standard use of the building the following input data is often fixed:

7. 

All needed input data for EPC assessments automatically builds into BIM as project proceeds.

8. 

What benefits are there of fast EPC calculations? 

9. 

Static calculations has the potential for more deatiled results than dynamic simulations.

10. 

When is EPC officially required? 

11. 

Special requirements for BIM modeling are not needed, if inter-operable file-formats are used for the energy simulations.

12. 

There are no national approaches allowed to EPC calculations. In EU all assessments are done in similar way for equal comparison.