FINAL EXAM Introduction of BIM enabled EPC assessments – Online course

To pass the course 80 % of the answers must be correct. In case you wish proof of passing the exam into your e-mail, add the needed information in the end of exam right before submitting. Certification of passing the exam is then automatically sent. Automated feedback is provided to all users on this page. Good luck!

1. 

What is the abbreviation of the directive behind EPC in the EU?

2. 

BIM enhance EPC assessment especially by

3. 

There are no national approaches allowed to EPC calculations. In EU all assessments are done in similar way for equal comparison.

4. 

Model Checkers can be utilized in EPC assessment for:

5. 

All needed input data for EPC assessments automatically builds into BIM as project proceeds.

6. 

In BIM-based projects all disciplines such as architects and HVAC-engineers work together on the same BIM model.

7. 

In assessing EPC for the standard use of the building the following input data is often fixed:

8. 

Where does the letters EPC come from?

9. 

In cases IFC-file is directly imported from BIM to energy simulation software, what kind of EPC data can then usually be transferred?

10. 

EPC calculators are based on equations reflecting the real world phenomena, such as thermodynamic equations.

11. 

When is EPC officially required? 


Name Email